• Project / Case Study

    GR14 Plastic Mesh for Grass Protection

    Within a few weeks, the grass has grown through the plastic reinforcement mesh

    Even in Autumn the newly seeded grass grows through the plastic mesh
  • Project / Case Study

    GR14 Plastic Mesh for Grass Protection

    Within a few weeks, the grass has grown through the plastic reinforcement mesh

    Even in Autumn the newly seeded grass grows through the plastic mesh
  • Project / Case Study

    GR14 Plastic Mesh for Grass Protection

    Within a few weeks, the grass has grown through the plastic reinforcement mesh

    Even in Autumn the newly seeded grass grows through the plastic mesh
SureGreen GR Grass Reinforcement Mesh Installation
Instructions
Grass Reinforcement MeshMake an
Enquiry
Buy
Now

Case Study / Project

Project:  Grassed Event area

Client:    Integra Property Management Ltd

Location:    Solomons Estate, Royal Tunbridge Wells

Product:    GR14 Grass Reinforcement Mesh

Issue

Integra Property Management group had been tasked to construct a large and robust grassed area to hold marketing events including a christmas theme village. Solomons Estate in Kent is within a SSSI protected area, and a solution to negate the intensive pedestrian trafficking that would put a strain on the grass was required.  So a solution was sought to create a natural grassed area, that required no or little disturbance and in keeping with the natural beauty of the estate.

Solution

An area within the estate was levelled off, drainage installed and the soil consolidated.  Suregreen GR14 Grass Reinforcement Mesh was laid on top of the prepared soil and seeded.  The GR14 grass mesh was chosen so the heavily pedestrianised areas would have structure and protection against the concentrated periods of foot traffic.  The plastic mesh protected the grass root structure and stopped the over compaction of the soils.  When not in use the area can be mown as normal and will have the appearance like the other well-kept lawns within the Salomons Estate and not out of keeping with the high standards required for the estate.  The mesh was installed in less than two weeks.